DOTHAN: 08:44 AM Dothan 911 dispatched a structure fire at 907 Walnut Street in Dothan. Reports to Dothan 911 smoke visible from roof, can hear popping inside the residence, and roof caving in. Reports are a two story residential structure.
Multiple Dothan Fire Engine Companies, Pilcher Ambulance and Dothan Police are responding.
08:48 AM Dothan Fire Engine Company 10 ( West Main ) has arrived, smoke coming from second floor, making an offensive attack, second in fire engine company connect to water supply.
08:50 AM Dothan Fire Truck 1 ( Central ) has arrived, second in.
08:51 AM Dothan Fire Battalion Chief Trawick arrived.
08:51 AM Fire appears to be on first floor. Making an attack at this time. Engine 9 ( Technology ) connecting to water supply.
08:52 AM Dothan Fire Engine 5 ( Eastside ) at fire hydrant at Walnut and Wheat and bringing water supply in.
08:53 AM Dothan Fire Engine Company 9 ( Technology ) has arrived on the scene. They are on deck – which means outside prepared to enter if interrior crew gets into trouble and ready to swap out with interrior if needed to.
08:55 AM Water on fire.
09:00 AM Fire is knocked down. Still in offensive mode. Ventilation has started.
09:17 AM Red Cross has been requested to respond to help residents.











